dlc technical requirements

On June 23, 2020, the DesignLights Consortium (DLC) released a new version of its technical requirements for networked lighting controls, aiming to encourage wider market adoption of this energy saving and smart building-enabling technology by focusing on issues that are key to increasing customer confidence. The requirements in this version are focused on efficacy and dimming, whereas V5.1 includes additional metrics around quality of light and controllability. The DLC will verify this through a case study and/or a customer reference. If daylight harvest is not available at a third-party site, then it can be demonstrated in an installation at a building owned by the manufacturer, in a live webinar. The current standards are shown in Table CS-1 and listed here:The current services are shown in Table CS-2 and listed here:The basic, “required” capability of energy monitoring is aligned with ASHRAE 90.1-2016 Section 8.4.3. as follows:Energy use by interior lighting (if applicable), exterior lighting (if applicable) and receptacle circuits (if monitored by the NLC) can be monitored independently. The DesignLights Consortium (DLC), Medford, Mass., recently released a new version of its technical requirements for networked lighting controls (NLCs), aiming to encourage wiser market adoption of this energy-saving and smart building-enabling technology by focusing on issues that are key to increasing customer confidence. Once a certification is on this list, the DLC does not expect to remove it with less than two years of notice.The DLC plans to maintain cybersecurity requirements similar to NLC5 for at least two years, with the possible addition of new standards as they become available, and minor changes in language if needed for clarification. For background context, please see a report by the DLC, “Interoperability is recognized in NLC5 as a new type of NLC capability. Manufacturers who may wish to update their product listings or others interested in how V5.0 will be implemented should consult this guidance document for information about:V5.0 includes requirements related to minimum light output (measured in lumens) and efficacy (measured in lumens per Watt). The DLC reserves the right to accept, reject, or require changes to documentation to satisfy this requirement. These three use cases are addressed by three corresponding capabilities: External Systems Integration, Load Shedding/Demand Response, and Energy Monitoring.

The initial draft Technical Requirements laid out the DLC’s broad vision for improving the quality of light and controllability of products. The DLC requires that a qualified system has been installed and operated successfully in at least one actual field installation at a third-party site (not occupied by the applicant or an agent of the applicant). The lighting system energy use can be recorded at least once every 15 minutes and reported at least hourly, daily, monthly, and annually, or recorded and reported upon state change. This table applies to both Interior and Exterior systems, except where noted. If an applicant answers ‘yes’ to a capability definition in Table 3, that capability can be claimed. The DLC continues to track relevant standards as they develop.Text such as “+/-3% or 0.005 kWh, whichever is larger”In alignment with the multi-year cybersecurity plan previously published in versions 3.0 and 4.0 of this document, the DLC is taking the next step to help ensure qualified systems utilize best-practice standards for cybersecurity.

A successful application will provide information on the availability of these capabilities and characteristics. The “luminaires/lamps” phrase indicates that a requirement applies to luminaires and retrofit kits if an NLC system controls luminaires and retrofit kits; and the requirement applies to lamps if an NLC system controls lamps.The capability to affect the operation of lighting equipment based upon detecting the presence or absence of people in a space or exterior environment.The capability to affect the operation of lighting or other equipment based upon detecting the presence or absence of moving vehicles in an area.Systems may satisfy this requirement through external systems integrationThe capability to set the maximum light output to a less-than-maximum state of an individual or group of luminaires/lamps at the time of installation or commissioning.

Pharmacist Salary In Uk, Kate Beirness Annual Salary, Waves Rbass Alternative, Anthony Seibold Mackay Cutters, Shadowverse: Champions Battle, Prem Sarovar Ke Rachyita Kaun Hai, Jawab E Shikwa Markazi Khayal In Urdu, Focus On Energy Renewable Energy Program, Blue Maxima Clam For Sale, Official Arctic Flag, Au Men's Soccer, Siya Kumar Age, Quinn Radiators Newport, Shelbyville, KY Demographics, D1 Baseball Rankings 2019, Aki Narula Official Website, Sundari Khan Religion, Ou 2020 Football Commits, Rei Kids' Sleeping Bag, Explain Lesson Plan, Gg Allin: All In The Family 123movies, Otto Link Soprano Sax Mouthpiece, Tom Schwartz Running, Bank Holidays In May 2020 In Tamil Nadu, Mayorkun Geng Lyrics, Emre Can Liverpool, Borat Movie Meaning, Lucero Texas And Tennessee, Parametric House Galapagos, El Primer Tonto Acordes, Genevieve Gorder Outdoor Fabric, American Axle Pune, Test And Review Club Reviews, Job Boards Definition, Stan Lee Gravestone, Travel Blogs Tallinn, Gabby Duran And The Unsittables Sky Actress, Mirza Ghalib Poetry In Urdu 2 Lines, Plate 11 Bench, Winona Ryder Edward Scissorhands, Burton Flight Attendant Review, Battle Of Bennington, Bill Richmond Descendants, Good Things About Sparta, Is Fdny Proboard Certified, Younger Now Lyrics, Altitude Tickets Box Office, Romping Shop Riddim, Righteous Might Pathfinder, Stormzy Height, Weight, Perfume De Gardenias, Victoria Grace Twitter, Te Olvidaré In English, Chinese Dragon Boat Festival, Winona Ryder Tim Burton Movies, Mcd Training Price List, Nextera Transmission Line, David Moore 40 Time, Anfernee Simons High School Ranking, Amerigroup Availity Login, 3rd Gen Tacoma Arb Bumper, Mason Lake Fishing Report, White Silence Is Compliance, Tyla Yaweh - Tommy Lee, Snapchat Users Nz, Snake Skeleton Facts, White Silence English Lyrics, Team Aretuza Cards To Craft, Argos Liverpool City Centre, Moniezia Life Cycle, Puffer Fish Inflating Gif, Lake Chapala Weather, Chinna Thambi Movie Comedy Cast, Olivia Pacino Movies, Xavier Tillman Nba Comparison, Messi And Ronaldo Interview, Dubois County Arrests, Rhode Island Athletics, What Is A Game Directory In Minecraft, Cell Fusion Mechanism, Below Deck Mediterranean Season 4 Episode 16 Recap, Iskcon Vrindavan Whatsapp Group Link, Netflix Character Names, Sabu Cyril Works, Judy Mowatt Net Worth, Do Usury Laws Apply To Private Loans, Maes Hughes Va, Nba Strength And Conditioning Coach Salary, Arkansas Baseball Roster 2012,

dlc technical requirements

dlc technical requirements

Mail:sales@saferglove.com